© 2001 - 2008 Stewart Design (UK) Ltd - All rights reserved.

Movement Joints

HomeHomeHome
About UsAbout UsAbout Us
NewsNewsNews
PortfolioPortfolioPortfolio
ServicesServicesServices
TechnicalTechnicalTechnical
Contact UsContact UsContact Us

Movement Joints

\ Home \ Technical \ Movement Joints

Vertical movement joints accommodate the movement along the length of a building. In many buildings, a structural movement joint (commonly known as an expansion joint) may be incorporated in the design of the main building structure and, where this is the case, the joint has to be taken through the cladding.

These are provided to accommodate the dimensional changes (most likely to be differential) between the units and the structure to which they are fixed, so that the cladding is not disrupted.

A movement joint should be placed between 1.5m and 3.0m away from any corner of the building, and the distance between the joints should not exceed 6m. Again, guidance for these can be found in 'BS 8298:1994', page 30.

technical

The requirements of every project are different, and so there is no 'definitive rules', which can be applied to all natural stone projects.

contact us

Stewart Design (UK) Limited
The Old Bakery,
Sheep Street,
Charlbury OX7 3RR

tel: +44 (0)1608 811500
fax: +44 (0)1608 811700
e-mail: design@stewartdesign.co.uk

Home About Us News Portfolio Services Technical Contact Us